The city of Gwadar, Pakistan, remains unconnected to the national power grid, and its residents suffer regular power cuts, yet a planned coal-fired power plant is not the best answer to the city’s problems.
近年来,随着政府和社会资本合作融资(PPP)项目模式的大力推行,越来越多的国家向私人投资人开放其发电领域,一大批国际独立发电商(Independent Power Producer, 简称“IPP”)项目应运而生,项目融资在IPP项目中的应用日益增多。本文通过对融资协议风险及某电力项目的融资情况进行分析,旨在总结经验,为投资者提供参考与借鉴,促进电力行业出海投融资活动的可持续发展。